The Dogstar, Brixton, London, 27.07.2011

by nastyarasputina

Future analysis has suggested that following an altercation that will occur on 24.07.2011 local time, the Aurora will be damaged and will require repair.  Repairs will be conducted over a three day period, during which time the crew will adopt the personae of indigenes of the planet Earth.  This will involve participating in cultural events, particularly a musical fund-raising affair, “Moulin Rage!“.  Any beings sympathetic to the Mechanisms and willing to assist in their continued deception of the local authorities are invited to attend.